SPECIAL INFO

Project Details

buildingTagore 8 is a commercial property located in 421 Tagore Industrial Avenue, Singapore 787805 in district D26. This commercial space is primarily used for Light Industrial (B1) rental and sale. This Light Industrial (B1) space is 1.99 km away from NS15 Yio Chu Kang MRT Station. It is also close to the future upcoming Springleaf & Lentor MRT stations.

The tenure of this commercial property is Freehold.

Sitting on a huge plot of 14,3310 sqft/13,314 sqm land area, the development will feature 128 units and a wide range of recreational facilities for future occupants to enjoy.

This freehold industrial developments are few and far between, especially those of impeccable quality. 

Project Details

tagore8-project-details

Location

location mpaTagore 8 is strategically located at 421 Tagore Industrial Ave,Singapore 787805. within close proximity to ammenities and future upcoming Springleaf & Lentor MRT Stations.

Enjoy a short drive from Tagore 8 @ Tagore Lane to SLE major expressway and about 20 minutes drive to the Central Business District via Leonie flyover.

It sits at the crossroads of convenience served by major expressways and multiple public transportation options, including the upcoming Thmson MRT Line. It is also within easy reach of numerous commercial and lifestyles amenities.

 

Technicalities

FIRST SCHEDULE
Specifications of Building.

FOUNDATION 
Generally reinforced concrete pile foundation. 

STRUCTURE 
Generally reinforced concrete structure. 

ROOF 
Reinforced concrete/metal jacked roof with insulation and waterproofing system where appropriate.

INTERNAL WALL 
Generally precast panel/block wall with skim coat and paint. 
Glazed wall tiles to toilets to height 2400mm and emulsion paint on skim coat about 2400mm height. 
Stone to 1st storey main lift lobby and homogeneous tile to 2nd to 4th storey main lift lobbies. 

EXTERNAL WALL 
Full height glazing where appropriate. 
Precast concrete panel/block wall where appropriate. 
Block walls with weather shield paint on skim coat/plastered surface. 

FLOOR LOADING

Duplex units: 10 kN/m2
Basement carpark: 5 kN/m2
Driveway: 10 kN/m2
Ramp: 10 kN/m2
Rooftop carpark: 5 kN/m2
1st to 4th storey (production): 10 kN/m2
1st to 4th storey (ancillary): 3 kN/m2


FLOOR TO FLOOR HEIGHT 

Duplex basement: 6.0m
1st to 4th storey: 6.0m


WINDOWS 
Aluminium-framed glazing curtain wall and window system with glazing.

DOORS 
Approved timber door with quality lockset to main entrance of units. 
Timber door with lockset to toilets.
Motorized metal roller shutter to unit frontage.
Glazing at1st storey units where applicable. 

CEILINGS 

Units: Generally skim coat only. 
Toilets: Suspended ceiling.
Common areas: Emulsion paint on skim coat/plaster.


FLOOR FINISHES 
Generally power float concrete floor to all areas except 1st storey passenger lift lobby, corridors and toilets with suspended ceiling. 

ELECTRICAL SUPPLY 

Duplex units: 100 A 3 Phase isolator
All other units: 60 A 3 Phase isolator 
(Note: Purchaser to apply for electrical meter)


FIRE PROTECTION 
Sprinkler and fire alarm system in compliance with statutory requirements. 
Dry risers and hose reel systems in common areas; Fire extinguishers, emergency lighting, exit signs and fire hydrants are provided in compliance with FSSD fire code.

AIR CONDITIONING/MECHANICAL 
Provision of air conditioning to 1st storey passenger lift lobby only.
Mechanical ventilation in compliance to authority requirements for designated areas.

Engineered smoke system are provided for the following:-
1. Basement factory and driveway by means of mechanical ventilation.
2. Level 1 to level 4 factory, driveway and ramps by means of natural or mechanical ventilation. 

LIFTS 
2 Goods lifts and 2 Fire lifts.

PLUMBING AND SANITARY 
28mm diameter tap off point provided at water meter compartment. 
(Note: Purchaser to apply for water meter)
Soil waste pipe, branch vent pipe and floor trap provided at designated locations.

TELECOMMUNICATION 
1 number of 10 pairs of black terminal provided at designated locations above false ceiling. 

LIGHTNING PROTECTION 
Lightning protection is provided to comply with latest code of practice.

PA SYSTEM 
1 number of basic speaker is provided at false ceiling for emergency use.

LOADING BAYS 

Basement: 10 loading bays
1st Storey: 11 loading bays
2nd Storey: 25 loading bays
3rd Storey: 25 loading bays
4th Storey: 24 loading bays

Floor Plan

tagore8-basement1tagore8-lvl1tagore8-lvl2tagore8-lvl3tagore8-lvl4tagore8-roof

 

Please download the full e-brochure below

ebrochure2

Register Here

 

Fill in the enquiry form for E-APP now! This is the condo that is not to be missed! 

Take charge of this opportunity right now.

Name
Email
Contact
Property
Interested in Unit Type
Level of Interest
Message
Security
What is 3 + tw0 ?

 

Tagore8 Rating: 5.0 out of 5 | Review By: Launch Property Singapore | ERA REALTY NETWORK PTE LTD | CEA Reg. No. L3002382K / R027596H | Connect with Launch Property Singapore @